Receive subcontracted finished goods
Open the Material Transferred Subcontracting Order. Select Create → Subcontracting Receipt.
Before you start
Use your authorized ERP account and the correct company. These screenshots use fictional staging records. Replace the example quantities, dates, warehouses and values with your approved business information. Submission affects the relevant workflow or stock ledger; review the draft first.
Addresses used in this tutorial
ERP_URL is your organization’s ERP address. ACADEMY_URL is the Academy base address: staging uses https://erpstaging.nexcommand.ai/academy; production uses https://academy.nexcommand.ai. Saved record IDs and temporary draft IDs differ between installations. Course IDs and element IDs in the example are not portable to another installation.
Step-by-step instructions
Create the receipt from the order
Open the Material Transferred Subcontracting Order. Select Create → Subcontracting Receipt.
- Example / selection
- SC-ORD-2026-00001
- Expected result
- The receipt inherits the finished good and supplier warehouse.
{ERP_URL}/desk/subcontracting-order/{RECORD_ID}
Review the delivery and accepted quantity
Enter the job-worker delivery-note reference. Verify accepted quantity, rejected quantity, accepted warehouse and supplier warehouse. Review any additional costs before saving.
- Example / selection
- DEMO-JW-DELIVERY-001; one assembly accepted; zero rejected
- Expected result
- The receipt describes what was actually received.
{ERP_URL}/desk/subcontracting-receipt/new-subcontracting-receipt-{TEMP_ID}
Save and review consumption
Save, then expand Raw Materials Consumed. Verify required and consumed quantities against the actual job and source BOM. Do not use Reset Raw Materials Table to bypass an unexplained stock discrepancy.
- Example / selection
- Four bolts and one bracket; finished-good value USD 71
- Expected result
- The draft consumption and valuation are ready for approval.
{ERP_URL}/desk/subcontracting-receipt/{RECORD_ID}
Submit the finished-goods receipt
Submit the reviewed receipt and confirm. Verify Completed status. Submission receives the assembly and consumes the supplied materials.
- Example / selection
- MAT-SCR-2026-00001
- Expected result
- The finished-good receipt is posted.
{ERP_URL}/desk/subcontracting-receipt/{RECORD_ID}
Verify the stock ledger
Choose View → Stock Ledger. Check the receipt voucher filter and reporting dates. Verify the assembly inward quantity and material outward quantities in the supplier warehouse.
- Example / selection
- Assembly +1; bolts -4; bracket -1
- Expected result
- The ledger confirms finished-goods receipt and supplied-material consumption.
{ERP_URL}/desk/query-report/Stock%20Ledger
Verified result
The staging receipt completed successfully. Its filtered stock ledger showed one assembly received into Finished Goods and four bolts plus one bracket consumed from the job-worker warehouse. The assembly value was USD 71. Supplier invoicing and payment are separate Finance workflows.
Troubleshooting
Wait for Link search results and choose the exact record. Leave each edited field to commit its value. Check required dates in every item row. A saved draft and a submitted record are different states. If validation fails, correct the highlighted field and verify the saved result before continuing.