NexCommand AINexCom Knowledge Base
Field reference

Work Order

How to use Work Order in Work Orders & Job Cards: access, working steps, fields, related records and troubleshooting.

Purpose and access

Release production using the approved BOM and operations. Capture work against job cards, record material transfer or consumption through the applicable stock documents, and record the finished output.

This page is a record page in Manufacturing → Work Orders & Job Cards. Use the link above to open the configured destination; permissions are checked by the destination service.

ERP links open in a new tab. Sign in with your own account; record visibility, actions and approval authority follow your assigned permissions. Screens can differ by company and configuration.

Before you start

Prepare the required information: Company, Series, Item To Manufacture, BOM No, Qty To Manufacture, Planned Start Date.

Confirm the company, party, dates, units and source references that apply. Select existing links carefully and check for an existing record before creating a duplicate.

Working steps

  1. Open Work Order from Manufacturing → Work Orders & Job Cards, or use ERP Search.
  2. Filter the list and open the relevant record. To add a record, use Add/New when your role provides that action.
  3. Complete the editable fields described below. Required fields and validation conditions must be satisfied; read-only values are set by the system or their source records.
  4. Add the required child rows. Review each row’s identifiers, linked records and values, using the child-table field reference below.
  5. Save the record and address validation messages. Reload and verify the saved values and relationships.
  6. When the draft is complete and you are authorized, submit it through the available approval process. Submission can create operational or accounting effects. Use the permitted cancellation/amendment process for later corrections.

Field reference

These fields come from the installed ERP definition. Hidden fields and password inputs are omitted. Additional conditions, custom scripts and workflow rules can make a field required or read-only in a particular context.

FieldType / behaviorHow to use it
CompanycompanyLink
Required
Choose an existing linked record. Check its company and ownership; typing a label alone does not create a new relationship.

Linked record: Company

Seriesnaming_seriesSelect
Required
Choose one of the configured list values. Status fields may be controlled by the record workflow.
Available choices
  • MFG-WO-.YYYY.-
Item To Manufactureproduction_itemLink
Required
Choose an existing linked record. Check its company and ownership; typing a label alone does not create a new relationship.

Linked record: Item

BOM Nobom_noLink
Required
Choose an existing linked record. Check its company and ownership; typing a label alone does not create a new relationship.

Linked record: BOM

Qty To ManufactureqtyFloat
Required
Enter a numeric value using the required unit and precision.
Sales Ordersales_orderLink
Optional
Choose an existing linked record. Check its company and ownership; typing a label alone does not create a new relationship.

Linked record: Sales Order

Reserve Stockreserve_stockCheck
Optional
Enable or disable the named option only when it matches the intended record behavior.
Material Transferred for Manufacturingmaterial_transferred_for_manufacturingFloat
Optional · Read-only
Enter a numeric value using the required unit and precision.
Additional Transferred Qtyadditional_transferred_qtyFloat
Optional · Read-only
Enter a numeric value using the required unit and precision.
Manufactured Qtyproduced_qtyFloat
Optional · Read-only
Enter a numeric value using the required unit and precision.
Process Loss Qtyprocess_loss_qtyFloat
Optional · Read-only
Enter a numeric value using the required unit and precision.
Disassembled Qtydisassembled_qtyFloat
Optional · Read-only
Enter a numeric value using the required unit and precision.
Source Warehousesource_warehouseLink
Optional
This is a location where raw materials are available.

Linked record: Warehouse

Work-in-Progress Warehousewip_warehouseLink
Optional
This is a location where operations are executed.

Linked record: Warehouse

Target Warehousefg_warehouseLink
Optional
This is a location where final product stored.

Linked record: Warehouse

Scrap Warehousescrap_warehouseLink
Optional
This is a location where scraped materials are stored.

Linked record: Warehouse

Transfer Material Againsttransfer_material_againstSelect
Optional
Choose one of the configured list values. Status fields may be controlled by the record workflow.
Available choices
  • Work Order
  • Job Card
OperationsoperationsTable
Optional
Add the relevant child rows and review required columns, quantities and references before saving.

Linked record: Work Order Operation

required_itemsrequired_itemsTable
Optional
Add the relevant child rows and review required columns, quantities and references before saving.

Linked record: Work Order Item

Allow Alternative Itemallow_alternative_itemCheck
Optional
Enable or disable the named option only when it matches the intended record behavior.
Use Multi-Level BOMuse_multi_level_bomCheck
Optional
Plan material for sub-assemblies
Skip Material Transfer to WIP Warehouseskip_transferCheck
Optional
Check if material transfer entry is not required
Backflush Raw Materials From Work-in-Progress Warehousefrom_wip_warehouseCheck
Optional
Enable or disable the named option only when it matches the intended record behavior.
Update Consumed Material Cost In Projectupdate_consumed_material_cost_in_projectCheck
Optional
Enable or disable the named option only when it matches the intended record behavior.
Planned Start Dateplanned_start_dateDatetime
Required
Record the date and time in the configured system/user time zone.
Planned End Dateplanned_end_dateDatetime
Optional
Record the date and time in the configured system/user time zone.
Expected Delivery Dateexpected_delivery_dateDate
Optional
Choose the business date required for this field. Confirm its relationship to other dates on the record.
Actual Start Dateactual_start_dateDatetime
Optional
Record the date and time in the configured system/user time zone.
Actual End Dateactual_end_dateDatetime
Optional
Record the date and time in the configured system/user time zone.
Lead Timelead_timeFloat
Optional · Read-only
In Mins
Planned Operating Costplanned_operating_costCurrency
Optional · Read-only
Enter the monetary amount in the applicable currency. Review the transaction and company currency before using the value.
Actual Operating Costactual_operating_costCurrency
Optional · Read-only
Enter the monetary amount in the applicable currency. Review the transaction and company currency before using the value.
Additional Operating Costadditional_operating_costCurrency
Optional
Enter the monetary amount in the applicable currency. Review the transaction and company currency before using the value.
Corrective Operation Costcorrective_operation_costCurrency
Optional · Read-only
From Corrective Job Card
Total Operating Costtotal_operating_costCurrency
Optional · Read-only
Enter the monetary amount in the applicable currency. Review the transaction and company currency before using the value.
Item Nameitem_nameData
Optional · Read-only
Enter the identifier or short text requested by the label. Preserve external reference numbers accurately.
Stock UOMstock_uomLink
Optional · Read-only
Choose an existing linked record. Check its company and ownership; typing a label alone does not create a new relationship.

Linked record: UOM

Item DescriptiondescriptionSmall Text
Optional · Read-only
Provide concise contextual information relevant to the record. Avoid unrelated personal or confidential data.
Has Serial Nohas_serial_noCheck
Optional · Read-only
Enable or disable the named option only when it matches the intended record behavior.
Has Batch Nohas_batch_noCheck
Optional · Read-only
Enable or disable the named option only when it matches the intended record behavior.
Batch Sizebatch_sizeFloat
Optional
Enter a numeric value using the required unit and precision.
Additional Costs (as per BOM)non_stock_itemsTable
Optional · Read-only
Add the relevant child rows and review required columns, quantities and references before saving.

Linked record: Work Order Additional Item

Secondary Items (as per BOM)secondary_itemsTable
Optional · Read-only
Add the relevant child rows and review required columns, quantities and references before saving.

Linked record: Work Order Additional Item

ProjectprojectLink
Optional
Choose an existing linked record. Check its company and ownership; typing a label alone does not create a new relationship.

Linked record: Project

Subcontracting Inward Ordersubcontracting_inward_orderLink
Optional · Read-only
Choose an existing linked record. Check its company and ownership; typing a label alone does not create a new relationship.

Linked record: Subcontracting Inward Order

Production Planproduction_planLink
Optional · Read-only
Choose an existing linked record. Check its company and ownership; typing a label alone does not create a new relationship.

Linked record: Production Plan

MPSmpsLink
Optional · Read-only
Choose an existing linked record. Check its company and ownership; typing a label alone does not create a new relationship.

Linked record: Master Production Schedule

Material Requestmaterial_requestLink
Optional · Read-only
Manufacture against Material Request

Linked record: Material Request

Production Plan Itemproduction_plan_itemData
Optional · Read-only
Enter the identifier or short text requested by the label. Preserve external reference numbers accurately.
Product Bundle Itemproduct_bundle_itemLink
Optional · Read-only
Choose an existing linked record. Check its company and ownership; typing a label alone does not create a new relationship.

Linked record: Item

StatusstatusSelect
Required · Read-only
Choose one of the configured list values. Status fields may be controlled by the record workflow.
Available choices
  • Draft
  • Submitted
  • Not Started
  • In Process
  • Stock Reserved
  • Stock Partially Reserved
  • Completed
  • Stopped
  • Closed
  • Cancelled
Amended Fromamended_fromLink
Optional · Read-only
Choose an existing linked record. Check its company and ownership; typing a label alone does not create a new relationship.

Linked record: Work Order

Child tables

Operations — child-row fields
FieldType / behaviorHow to use it
OperationoperationLink
Required
Choose an existing linked record. Check its company and ownership; typing a label alone does not create a new relationship.

Linked record: Operation

StatusstatusSelect
Optional
Choose one of the configured list values. Status fields may be controlled by the record workflow.
Available choices
  • Pending
  • Work in Progress
  • Completed
Completed Qtycompleted_qtyFloat
Optional
Operation completed for how many finished goods?
Process Loss Qtyprocess_loss_qtyFloat
Optional · Read-only
Enter a numeric value using the required unit and precision.
Pending Qtypending_qtyFloat
Optional · Read-only
Enter a numeric value using the required unit and precision.
BOMbomLink
Optional
Choose an existing linked record. Check its company and ownership; typing a label alone does not create a new relationship.

Linked record: BOM

Workstation Typeworkstation_typeLink
Optional
Choose an existing linked record. Check its company and ownership; typing a label alone does not create a new relationship.

Linked record: Workstation Type

WorkstationworkstationLink
Optional
Choose an existing linked record. Check its company and ownership; typing a label alone does not create a new relationship.

Linked record: Workstation

Sequence IDsequence_idInt
Optional
Enter a whole-number value.
Quality Inspection Requiredquality_inspection_requiredCheck
Optional
Enable or disable the named option only when it matches the intended record behavior.
BOM No (For Semi-Finished Goods)bom_noLink
Optional · Read-only
Choose an existing linked record. Check its company and ownership; typing a label alone does not create a new relationship.

Linked record: BOM

Semi Finished Goods / Finished Goodsfinished_goodLink
Optional · Read-only
Choose an existing linked record. Check its company and ownership; typing a label alone does not create a new relationship.

Linked record: Item

Is Subcontractedis_subcontractedCheck
Optional · Read-only
Enable or disable the named option only when it matches the intended record behavior.
Skip Material Transferskip_material_transferCheck
Optional · Read-only
Enable or disable the named option only when it matches the intended record behavior.
Backflush Materials From WIP Warehousebackflush_from_wip_warehouseCheck
Optional · Read-only
Enable or disable the named option only when it matches the intended record behavior.
Source Warehousesource_warehouseLink
Optional
Choose an existing linked record. Check its company and ownership; typing a label alone does not create a new relationship.

Linked record: Warehouse

WIP WHwip_warehouseLink
Optional
Choose an existing linked record. Check its company and ownership; typing a label alone does not create a new relationship.

Linked record: Warehouse

Finished Goods Warehousefg_warehouseLink
Optional
Choose an existing linked record. Check its company and ownership; typing a label alone does not create a new relationship.

Linked record: Warehouse

Operation DescriptiondescriptionText Editor
Optional
Maintain formatted content for the record; review any public-facing output before publishing.
Planned Start Timeplanned_start_timeDatetime
Optional · Read-only
Record the date and time in the configured system/user time zone.
Hour Ratehour_rateFloat
Optional · Read-only
Enter a numeric value using the required unit and precision.
Timetime_in_minsFloat
Required
In Minutes
Planned End Timeplanned_end_timeDatetime
Optional · Read-only
Record the date and time in the configured system/user time zone.
Batch Sizebatch_sizeFloat
Optional
Enter a numeric value using the required unit and precision.
Planned Operating Costplanned_operating_costCurrency
Optional · Read-only
Enter the monetary amount in the applicable currency. Review the transaction and company currency before using the value.
Actual Start Timeactual_start_timeDatetime
Optional · Read-only
Updated via 'Time Log' (In Minutes)
Actual Operation Timeactual_operation_timeFloat
Optional · Read-only
Updated via 'Time Log' (In Minutes)
Actual End Timeactual_end_timeDatetime
Optional · Read-only
Updated via 'Time Log' (In Minutes)
Actual Operating Costactual_operating_costCurrency
Optional · Read-only
(Hour Rate / 60) * Actual Operation Time
required_items — child-row fields
FieldType / behaviorHow to use it
OperationoperationLink
Optional
Choose an existing linked record. Check its company and ownership; typing a label alone does not create a new relationship.

Linked record: Operation

Item Codeitem_codeLink
Optional
Choose an existing linked record. Check its company and ownership; typing a label alone does not create a new relationship.

Linked record: Item

Source Warehousesource_warehouseLink
Optional
Choose an existing linked record. Check its company and ownership; typing a label alone does not create a new relationship.

Linked record: Warehouse

Operation Row Idoperation_row_idInt
Optional · Read-only
Enter a whole-number value.
Item Nameitem_nameData
Optional · Read-only
Enter the identifier or short text requested by the label. Preserve external reference numbers accurately.
DescriptiondescriptionText
Optional · Read-only
Provide the required record description or content. Keep operational instructions clear and applicable.
Allow Alternative Itemallow_alternative_itemCheck
Optional
Enable or disable the named option only when it matches the intended record behavior.
Include Item In Manufacturinginclude_item_in_manufacturingCheck
Optional
Enable or disable the named option only when it matches the intended record behavior.
Required Qtyrequired_qtyFloat
Optional
Enter a numeric value using the required unit and precision.
Stock UOMstock_uomLink
Optional · Read-only
Choose an existing linked record. Check its company and ownership; typing a label alone does not create a new relationship.

Linked record: UOM

RaterateCurrency
Optional · Read-only
Enter the monetary amount in the applicable currency. Review the transaction and company currency before using the value.
AmountamountCurrency
Optional · Read-only
Enter the monetary amount in the applicable currency. Review the transaction and company currency before using the value.
Transferred Qtytransferred_qtyFloat
Optional · Read-only
Enter a numeric value using the required unit and precision.
Consumed Qtyconsumed_qtyFloat
Optional · Read-only
Enter a numeric value using the required unit and precision.
Returned Qtyreturned_qtyFloat
Optional · Read-only
Enter a numeric value using the required unit and precision.
Available Qty at Source Warehouseavailable_qty_at_source_warehouseFloat
Optional · Read-only
Enter a numeric value using the required unit and precision.
Available Qty at WIP Warehouseavailable_qty_at_wip_warehouseFloat
Optional · Read-only
Enter a numeric value using the required unit and precision.
Stock Reserved Qtystock_reserved_qtyFloat
Optional · Read-only
Enter a numeric value using the required unit and precision.
Is Additional Itemis_additional_itemCheck
Optional · Read-only
Enable or disable the named option only when it matches the intended record behavior.
Is Customer Provided Itemis_customer_provided_itemCheck
Optional · Read-only
Enable or disable the named option only when it matches the intended record behavior.
Voucher Detail Referencevoucher_detail_referenceData
Optional · Read-only
Enter the identifier or short text requested by the label. Preserve external reference numbers accurately.
Additional Costs (as per BOM) — child-row fields
FieldType / behaviorHow to use it
Item Codeitem_codeLink
Optional
Choose an existing linked record. Check its company and ownership; typing a label alone does not create a new relationship.

Linked record: Item

TypetypeData
Optional
Enter the identifier or short text requested by the label. Preserve external reference numbers accurately.
QtyqtyFloat
Optional
Enter a numeric value using the required unit and precision.
UOMuomLink
Optional
Choose an existing linked record. Check its company and ownership; typing a label alone does not create a new relationship.

Linked record: UOM

RaterateCurrency
Optional
Enter the monetary amount in the applicable currency. Review the transaction and company currency before using the value.
AmountamountCurrency
Optional
Enter the monetary amount in the applicable currency. Review the transaction and company currency before using the value.
Secondary Items (as per BOM) — child-row fields
FieldType / behaviorHow to use it
Item Codeitem_codeLink
Optional
Choose an existing linked record. Check its company and ownership; typing a label alone does not create a new relationship.

Linked record: Item

TypetypeData
Optional
Enter the identifier or short text requested by the label. Preserve external reference numbers accurately.
QtyqtyFloat
Optional
Enter a numeric value using the required unit and precision.
UOMuomLink
Optional
Choose an existing linked record. Check its company and ownership; typing a label alone does not create a new relationship.

Linked record: UOM

RaterateCurrency
Optional
Enter the monetary amount in the applicable currency. Review the transaction and company currency before using the value.
AmountamountCurrency
Optional
Enter the monetary amount in the applicable currency. Review the transaction and company currency before using the value.

Troubleshooting

  • Not permitted: verify the account, role and source-document permission. Do not share an administrator login.
  • Missing record or address: inspect the relevant Link or Dynamic Link fields; a matching title alone does not establish a relationship.
  • Cannot save or change status: review required fields, read-only values, document status and the configured approval transition.
  • Unexpected report or portal result: review company/date filters, source-document submission and the approved party or Employee link.