NexCommand AINexCom Knowledge Base
Field reference

Manufacturing Settings

How to use Manufacturing Settings in Manufacturing Setup: access, working steps, fields, related records and troubleshooting.

Purpose and access

Review manufacturing defaults, production warehouses and capacity-related records. Test changes in staging with representative products and workflows before applying them to a live production process.

This page is a settings page in Manufacturing → Manufacturing Setup. Use the link above to open the configured destination; permissions are checked by the destination service.

ERP links open in a new tab. Sign in with your own account; record visibility, actions and approval authority follow your assigned permissions. Screens can differ by company and configuration.

Before you start

Review the current settings or existing records and prepare the information needed for the change.

Confirm the company, party, dates, units and source references that apply. Select existing links carefully and check for an existing record before creating a duplicate.

Working steps

  1. Open Manufacturing Settings from Manufacturing → Manufacturing Setup, or use ERP Search.
  2. Review the existing configuration before editing.
  3. Complete the editable fields described below. Required fields and validation conditions must be satisfied; read-only values are set by the system or their source records.
  4. Save the record and address validation messages. Reload and verify the saved values and relationships.
  5. Use any additional workflow actions only when the record and your role provide them. Saving this record does not automatically complete a related transaction or external action.

Field reference

These fields come from the installed ERP definition. Hidden fields and password inputs are omitted. Additional conditions, custom scripts and workflow rules can make a field required or read-only in a particular context.

FieldType / behaviorHow to use it
Allow Continuous Material Consumptionmaterial_consumptionCheck
Optional
Allow material consumptions without immediately manufacturing finished goods against a Work Order
Get Raw Materials Cost from Consumption Entryget_rm_cost_from_consumption_entryCheck
Optional
Enable or disable the named option only when it matches the intended record behavior.
Backflush Raw Materials Based Onbackflush_raw_materials_based_onSelect
Optional
Choose one of the configured list values. Status fields may be controlled by the record workflow.
Available choices
  • BOM
  • Material Transferred for Manufacture
Validate Components and Quantities Per BOMvalidate_components_quantities_per_bomCheck
Optional
Enable or disable the named option only when it matches the intended record behavior.
Update BOM Cost Automaticallyupdate_bom_costs_automaticallyCheck
Optional
Update BOM cost automatically via scheduler, based on the latest Valuation Rate/Price List Rate/Last Purchase Rate of raw materials
Allow Editing of Items and Quantities in Work Orderallow_editing_of_items_and_quantities_in_work_orderCheck
Optional
If enabled, the system will allow users to edit the raw materials and their quantities in the Work Order. The system will not reset the quantities as per the BOM, if the user has changed them.
Overproduction Percentage For Sales Orderoverproduction_percentage_for_sales_orderPercent
Optional
Enter the percentage expected by the calculation and verify the resulting amount.
Overproduction Percentage For Work Orderoverproduction_percentage_for_work_orderPercent
Optional
Enter the percentage expected by the calculation and verify the resulting amount.
Transfer Extra Raw Materials to WIP (%)transfer_extra_materials_percentagePercent
Optional
The user will be able to transfer additional materials from the store to the Work in Progress (WIP) warehouse.
Add Corrective Operation Cost in Finished Good Valuationadd_corrective_operation_cost_in_finished_good_valuationCheck
Optional
Enable or disable the named option only when it matches the intended record behavior.
Enforce Time Logsenforce_time_logsCheck
Optional
Enabling this checkbox will force each Job Card Time Log to have From Time and To Time
Allow Excess Material Transferjob_card_excess_transferCheck
Optional
Allow transferring raw materials even after the Required Quantity is fulfilled
Disable Capacity Planningdisable_capacity_planningCheck
Optional
Enable or disable the named option only when it matches the intended record behavior.
Allow Overtimeallow_overtimeCheck
Optional
Plan time logs outside Workstation working hours
Allow Production on Holidaysallow_production_on_holidaysCheck
Optional
Enable or disable the named option only when it matches the intended record behavior.
Capacity Planning For (Days)capacity_planning_for_daysInt
Optional
Plan operations X days in advance
Time Between Operations (Mins)mins_between_operationsInt
Optional
Default: 10 mins
Set Operating Cost / Secondary Items From Sub-assembliesset_op_cost_and_secondary_items_from_sub_assembliesCheck
Optional
To include sub-assembly costs and secondary items in Finished Goods on a work order without using a job card, when the 'Use Multi-Level BOM' option is enabled.
Make Serial No / Batch from Work Ordermake_serial_no_batch_from_work_orderCheck
Optional
System will automatically create the serial numbers / batch for the Finished Good on submission of work order

Troubleshooting

  • Not permitted: verify the account, role and source-document permission. Do not share an administrator login.
  • Missing record or address: inspect the relevant Link or Dynamic Link fields; a matching title alone does not establish a relationship.
  • Cannot save or change status: review required fields, read-only values, document status and the configured approval transition.
  • Unexpected report or portal result: review company/date filters, source-document submission and the approved party or Employee link.