NexCommand AINexCom Knowledge Base
Report

BOM Operations Time

How to use BOM Operations Time in Bills of Materials: access, working steps, fields, related records and troubleshooting.

Purpose and access

Define the finished item, component quantities and applicable operations in a BOM. Review units, scrap and costing before approval. An active/default BOM influences later production planning; it does not itself move stock.

This page is a report in Manufacturing → Bills of Materials. Use the link above to open the configured destination; permissions are checked by the destination service.

ERP links open in a new tab. Sign in with your own account; record visibility, actions and approval authority follow your assigned permissions. Screens can differ by company and configuration.

Run and interpret the report

Report implementation: Script Report. Source record type: BOM.

  1. Open the report and inspect its actual filter controls.
  2. Select the company, date range and other required filters shown on that report. Filter requirements differ between reports.
  3. Run or refresh the report. Confirm the period and filters before comparing totals.
  4. Follow source-record links where available and verify whether drafts, submitted records, cancellations and opening balances are included.
  5. Export only when your role permits it and the recipient is authorized to receive the information.

Before comparing results

Compare the same company, period, currency and dimensions. Check whether the report measures a current balance, activity during a period, a transaction count or an ageing position. A report result does not authorize a change to a source record.

Troubleshooting

  • Not permitted: verify the account, role and source-document permission. Do not share an administrator login.
  • Missing record or address: inspect the relevant Link or Dynamic Link fields; a matching title alone does not establish a relationship.
  • Cannot save or change status: review required fields, read-only values, document status and the configured approval transition.
  • Unexpected report or portal result: review company/date filters, source-document submission and the approved party or Employee link.